Bujagali Interconnection Project

Status

Commissioned

Objectives

Provision of adequate transmission capacity to evacuate power generated at Bujagali Hydro Power Station (HPS) to the existing National grid.

Scope

• Bujagali-Kawanda 220kV, 75km.
• Kawanda-Mutundwe 132kV, 17km.
• Bujagali-Nalubaale 132kV, 5km.
• Bujagali-Tororo 132kV, 8km.
• Kawanda S/S 132/33kV, 32/40MVA.
• Mutundwe Substation Extension.
• Switchyard upgrade to 220/132kV substation

Financier(s)

  1. African Development Bank
  2. Japan International Cooperation Agency

Status

Commissioned in 2016