Kampala Metropolitan Transmission System Improvement Project

Project Name

Kampala Metropolitan Transmission System  Project

Objectives
  • To reinforce the power transmission grid in the Kampala metropolitan area for reliable future supply of electricity.
Scope
  • Mukono 3x125MVA, 220/132kV (New); Buloba, 2x125MVA,220/132kV; 2x40MVA 132/33kV (New); Kawaala 3x40MVA 132/33kV; 1x20MVA 132/11kV (Upgrade), Mutundwe Substation reconfiguration to double busbar (Upgrade), Mobile Substation 1x20MVA, 132/33kV (new); Bujagali 1x250MVA 220/132kV; Reconductoring to HTLS Mukono – Kampala North; Kampala North – Lugogo; Kampala North – Mutundwe)
Financier(s)
  • Japan International Cooperation Agency (JICA)
  • Government of Uganda
Status
  • Procurement of Engineering, Procurement and Construction contractor is ongoing