Ayago Interconnection project (10km)
Project Name
Ayago Interconnection project (10km)
Objectives
Bujagali Interconnection Project to provide adequate transmission capacity to evacuate power generated at Ayago Hydro Power Station (HPS).
Financier(s)
- China Exim Bank
Achievement/Status
- Feasibility concluded