Power Evacuation Projects
No. Project Objective Status 1 Muzizi Interconnection: (2x90 MVA 220/132/33kV Muzizi Substation) Provision of transmission capacity to evacuate power from Muzizi Hydro Power Plant (HPP) Sourcing for financing for implementation 2 Ayago Interconnection Project Provision of Transmission capacity to evacuate power from Ayago Hydro Power Plant (HPP) At Feasibility Study/ Project Proposal
Electrification of Industrial Parks
Scope Luzira Industrial Park 132/133kV Substation and transmission Line Project (15km) Mukono Industrial Park 132/133kV Substation and Transmission Line Project (5km) Iganga Industrial Park 132/133kV Substation and Transmission Line Project (10x2km) Namanve Industrial Park 132/133kV Substation and Transmission Line Project (5km) Objectives Provision of adequate transmission